Most kitchens are fitted in 2 days See Typical Schedule below:

Day 1 Take out,take rubbish,first fix Electrical connections, repair/screed floor

Day 2 Plaster if required -Full room done in 1 day by the A Team

Day 3 Drying and floor screed if required

Day 4 Fit Kitchen

Day 5 Fit Kitchen and second Fix Electricals

Day 6 Fit Floor and/or Fit Wall Tiles-(Quicker if NO plastering required)